SAIGON CONSTRUCTION CONSULTANTS CO., LTD

    CLIENT

    TOA PAINT VIETNAM CO., LTD (THAILAND)

    CONSTRUCTION COSTS

    $ 2.0 million
     

    COMPLETE THE SERVICE

    Mar-2007

    ROLE OF SCC

    - Design Architect, structure, infrastructure, M&E and fire fighting

    - Cost estimation

    - Soil investigation

    - Land survey

    - Environmental impacted study

    - Submission fo construction permit

TOA PAINT VIETNAM FACTORY

This Toa Paint Vietnam factory is built in Tan Dong Hiep A IP, Binh Duong province, Vietnam with the information is as follows:

  • Land area:               3.0 Ha
  • Construction area: 11,000 m2
  • Product:                   paints and coatings, chemicals, petrochemicals, automotive paint technology …